News of 2025-09 Sep

From DISI
Revision as of 21:21, 18 September 2025 by Frodo (talk | contribs) (asdf)
Jump to navigation Jump to search

This is the news of September 2025.

  • we are building H30-H33 P300-350 in zinc-22c.
  • we have removed zinc-22n/H24 from Wynton to make space
  • currently is [a-m] for all tranches in all layers, except zinc-22n where H24, H25, H26 are missing
  • we are creating a new version of the 3d building pipeline that uses the Uppsala drop-in replacements for auxilliary programs.
  • we are working on natural products (more soon)


Change coming by the end of September 2025

  • to cover all tranches and layers evenly, we are changing what we load on Wynton.
  • currently (to late September 2025) we have all layers, with the /[a-m]/ tranches on Wynton
  • except: zinc-22n/H2[456] is not on Wynton
  • to dock /[n-z]/ you must currently dock on gimel OR AWS.

At the end of September, this will change as follows:

  • all layer in all tranches /[a-j]/ will be on Wynton, including in zinc-22n/H2[456]
  • this will provide representative coverage of all layers of ZINC-22, including zinc-22n
  • To dock, /[k-z]/ you must use gimel or AWS.
  • Thus 38% of ZINC-22 will be on Wynton (occupying about 1.2 PB)
  • 100% of ZINC-22 will be on gimel and AWS. (occupying about 3.2 PB total)

This means:

  • you can dock a representative sample of ZINC-22 on Wynton
  • with either Wynton + gimel or Wynton+AWS or AWS alone or gimel alone you can dock 100% of the 10 B ZINC-22 mols
  • we have enough room on Wynton for new projects including for 4.4 T databases and so on.

Thank you for reading. Please let your IT team know of any concerns.