ZINC22:Timeline

From DISI
Revision as of 22:32, 14 December 2020 by Frodo (talk | contribs) (asdf)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This is the timeline page for ZINC22.

  • March 1, 2020, first discussion of a radical redesign
  • July 1, 2020, first beta of 2D and 3D
  • July-Aug, 2020. furious work to get 3D building as fast as possible
  • Sept 15, 2020, start building 3D molecules
  • Dec 31, 2020, first billion molecules built

projections

May 1, 2021, 2 billion 3D ready to dock Dec 31, 2021, 4 billion 3D ready to dock