Cluster 1: Difference between revisions

From DISI
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
Our cluster at the [[University of Toronto St George Campus]] is described on this page.
Our cluster at the [[University of Toronto St George Campus]] is described on this page.
We also have a [[UCSF Cluster]] from our time in San Francisco.  
We also have a [[UCSF Cluster]] from our time in San Francisco.  
{{TOCright}}


= Primary Logical Machines =
= Primary Logical Machines =

Revision as of 22:30, 6 April 2013

Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.

Primary Logical Machines

These are machines you should log in to to do work.

sgehead

  • log in here for routine access to the cluster
  • epik / Schrodinger
  • portland group compilers

ppilot

  • pipeline pilot licenses

Secondary Logical Machines

You should not need to log in to these machines, generally, unless you are working on the functions they support.

contact

  • static web server (e.g. lab web page, wordpress pages)

oz

  • dynamic web server (e.g. ZINC, DUDE, DOCK Blaster)

Taxi

  • ZINC database server
  • cloud machine

Django

  • cloud machine

Pulp

  • cloud machine

Raiders

  • cloud machine

Strangelove

  • cloud machine

Infrastructure Machines

Fawlty & Towers

  • disk servers

Blues

  • function

Goldmember

  • function

Darkness

  • function

Spinaltap

  • 389 server

Physical Machines

Rack 1

Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)

  • 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
  • HP disk head node, (25 TB raw disk systems ) x 4.
  • Dell disk head node x 1, Dell SAS 2TB x 8??.
  • DL165 x 4. 8x4 = 32 cores.
  • Dell Switch x 1
  • UPS

Rack 2

Currently in Pharmacy 8xx. Planned June 2013

  • Dell PowerEdge C6145
  • Dell Switch
  • 42 tape robot backup system
  • dedicated computer for backup

Rack 3

Currently in Pharmacy 8xx. Planned June 2013

  • Dell PowerEdge C6145
  • Dell Switch
  • legacy nodes

Rack 4

Currently in Pharmacy 8xx. Planned June 2013

  • will be: Dell PowerEdge 6145
  • Dell Switch
  • legacy nodes

Rack 5

Currently in Pharmacy 8xx. Planned June 2013

  • will be: Dell PowerEdge 6145
  • Dell Switch
  • legacy nodes


Wet Lab

Donnelly 940. Planned June 2013.

  • 4 instrument workstations
  • 3 linux desktops HP Z430
  • 1 windows7 desktop HP Z400
  • 1 color printer
  • 3 Mac lab laptops

Dry Lab

Donnelly 650. Planned June 2013.

  • 6 linux desktops. HP Z430
  • 1 windows7 desktop HP Z400
  • 6 Mac lab laptops

Other Offices and locations

  • BKS office
  • JJI office
  • desk space in OICR

About our cluster