Cluster 1: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
Our cluster at the [[University of Toronto St George Campus]] is described on this page. | Our cluster at the [[University of Toronto St George Campus]] is described on this page. | ||
We also have a [[UCSF Cluster]] from our time in San Francisco. | We also have a [[UCSF Cluster]] from our time in San Francisco. | ||
{{TOCright}} | |||
= Primary Logical Machines = | = Primary Logical Machines = |
Revision as of 22:30, 6 April 2013
Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.
Primary Logical Machines
These are machines you should log in to to do work.
sgehead
- log in here for routine access to the cluster
- epik / Schrodinger
- portland group compilers
ppilot
- pipeline pilot licenses
Secondary Logical Machines
You should not need to log in to these machines, generally, unless you are working on the functions they support.
contact
- static web server (e.g. lab web page, wordpress pages)
oz
- dynamic web server (e.g. ZINC, DUDE, DOCK Blaster)
Taxi
- ZINC database server
- cloud machine
Django
- cloud machine
Pulp
- cloud machine
Raiders
- cloud machine
Strangelove
- cloud machine
Infrastructure Machines
Fawlty & Towers
- disk servers
Blues
- function
Goldmember
- function
Darkness
- function
Spinaltap
- 389 server
Physical Machines
Rack 1
Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)
- 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
- HP disk head node, (25 TB raw disk systems ) x 4.
- Dell disk head node x 1, Dell SAS 2TB x 8??.
- DL165 x 4. 8x4 = 32 cores.
- Dell Switch x 1
- UPS
Rack 2
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch
- 42 tape robot backup system
- dedicated computer for backup
Rack 3
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch
- legacy nodes
Rack 4
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch
- legacy nodes
Rack 5
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch
- legacy nodes
Wet Lab
Donnelly 940. Planned June 2013.
- 4 instrument workstations
- 3 linux desktops HP Z430
- 1 windows7 desktop HP Z400
- 1 color printer
- 3 Mac lab laptops
Dry Lab
Donnelly 650. Planned June 2013.
- 6 linux desktops. HP Z430
- 1 windows7 desktop HP Z400
- 6 Mac lab laptops
Other Offices and locations
- BKS office
- JJI office
- desk space in OICR