Cluster 1: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
We also have a [[UCSF Cluster]] from our time in San Francisco. | We also have a [[UCSF Cluster]] from our time in San Francisco. | ||
Rack 1 | = Logical Machines = | ||
== sgehead == | |||
* log in here for routine access to the cluster | |||
== contact == | |||
* static web server (e.g. lab web page, wordpress pages) | |||
== oz == | |||
* dynamic web server (e.g. ZINC, DUDE, DOCK Blaster) | |||
== Taxi == | |||
* ZINC database server | |||
* cloud machine | |||
== Django == | |||
* cloud machine | |||
== Pulp == | |||
* cloud machine | |||
== Raiders == | |||
* cloud machine | |||
== Strangelove == | |||
* cloud machine | |||
= Infrastructure Machines = | |||
== Fawlty & Towers == | |||
* disk servers | |||
== Blues == | |||
* function | |||
== Goldmember == | |||
* function | |||
== Darkness == | |||
* function | |||
== Spinaltap == | |||
* 389 server | |||
= Physical Machines = | |||
== Rack 1 == | |||
Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw) | |||
* 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores. | * 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores. | ||
Line 11: | Line 57: | ||
* UPS | * UPS | ||
Rack 2 | == Rack 2 == | ||
Currently in Pharmacy 8xx. Planned June 2013 | |||
* Dell PowerEdge C6145 | * Dell PowerEdge C6145 | ||
Line 18: | Line 65: | ||
* dedicated computer for backup | * dedicated computer for backup | ||
Rack 3 | == Rack 3 == | ||
Currently in Pharmacy 8xx. Planned June 2013 | |||
* Dell PowerEdge C6145 | * Dell PowerEdge C6145 | ||
* Dell Switch | * Dell Switch | ||
* legacy nodes | * legacy nodes | ||
Rack 4. Currently in Pharmacy 8xx. Planned June 2013 | == Rack 4 == | ||
Currently in Pharmacy 8xx. Planned June 2013 | |||
* will be: Dell PowerEdge 6145 | |||
* Dell Switch | |||
* legacy nodes | |||
== Rack 5 == | |||
Currently in Pharmacy 8xx. Planned June 2013 | |||
* will be: Dell PowerEdge 6145 | * will be: Dell PowerEdge 6145 | ||
* Dell Switch | * Dell Switch | ||
* legacy nodes | * legacy nodes | ||
Wet Lab | |||
== Wet Lab == | |||
Donnelly 940. Planned June 2013. | |||
* 4 instrument workstations | * 4 instrument workstations | ||
* 3 linux desktops HP Z430 | * 3 linux desktops HP Z430 | ||
Line 35: | Line 93: | ||
* 3 Mac lab laptops | * 3 Mac lab laptops | ||
Dry Lab | == Dry Lab == | ||
Donnelly 650. Planned June 2013. | |||
* 6 linux desktops. HP Z430 | * 6 linux desktops. HP Z430 | ||
* 1 windows7 desktop HP Z400 | * 1 windows7 desktop HP Z400 | ||
* 6 Mac lab laptops | * 6 Mac lab laptops | ||
== Other Offices and locations == | |||
* BKS office | |||
* JJI office | |||
* desk space in OICR | |||
[[About our cluster]] | [[About our cluster]] |
Revision as of 22:26, 6 April 2013
Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.
Logical Machines
sgehead
- log in here for routine access to the cluster
contact
- static web server (e.g. lab web page, wordpress pages)
oz
- dynamic web server (e.g. ZINC, DUDE, DOCK Blaster)
Taxi
- ZINC database server
- cloud machine
Django
- cloud machine
Pulp
- cloud machine
Raiders
- cloud machine
Strangelove
- cloud machine
Infrastructure Machines
Fawlty & Towers
- disk servers
Blues
- function
Goldmember
- function
Darkness
- function
Spinaltap
- 389 server
Physical Machines
Rack 1
Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)
- 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
- HP disk head node, (25 TB raw disk systems ) x 4.
- Dell disk head node x 1, Dell SAS 2TB x 8??.
- DL165 x 4. 8x4 = 32 cores.
- Dell Switch x 1
- UPS
Rack 2
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch
- 42 tape robot backup system
- dedicated computer for backup
Rack 3
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch
- legacy nodes
Rack 4
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch
- legacy nodes
Rack 5
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch
- legacy nodes
Wet Lab
Donnelly 940. Planned June 2013.
- 4 instrument workstations
- 3 linux desktops HP Z430
- 1 windows7 desktop HP Z400
- 1 color printer
- 3 Mac lab laptops
Dry Lab
Donnelly 650. Planned June 2013.
- 6 linux desktops. HP Z430
- 1 windows7 desktop HP Z400
- 6 Mac lab laptops
Other Offices and locations
- BKS office
- JJI office
- desk space in OICR