Cluster 1: Difference between revisions
Jump to navigation
Jump to search
m (Frodo moved page UofT Cluster to Cluster 1: rationalization) |
No edit summary |
||
Line 135: | Line 135: | ||
[[Category:Cluster]] | [[Category:Cluster]] | ||
[[Category:Internal]] | [[Category:Internal]] | ||
Revision as of 21:36, 27 February 2014
Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.
. The roles of computers are classified below.
General
routine access to cluster
- sgehead
pipeline pilot license
- ppilot
Software development
pgf fortran compiler
- sgehead
Sysadmin
static web server
- runaway (vm on rocky)
- includes wiki, www
- NB was contact at some point, kinda liked that name for a webserver
- includes drupal
- includes wordpress
postgres server
- production: taxi
- intern: raiders
dynamic web server (ZINC, etc)
- oz
SEA server
- fawlty
- mysql server is on msqlserver aka inception
- fingerprint server is on fingerprint aka darkcrystal
NFS Disk servers
- fawlty
- towers
Name reuse pool
- vertigo
- sundance
- spotless
- lostark
- airplane
- brian
- terminator
- psycho
- strangelove
Cloud machines (hypervisor)
- Django
- Pulp
- Raiders
- Strangelove
- Rocky
Unknown/unassigned function
- blues
- goldmember
- darkness
389 Server
- spinaltap
Physical Machines
NB this section needs updating!
Rack 1
Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)
- 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
- HP disk head node, (25 TB raw disk systems ) x 4.
- Dell disk head node x 1, Dell SAS 2TB x 8??.
- DL165 x 4. 8x4 = 32 cores.
- Dell Switch: switch-1-1.
- UPS
Rack 2
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch: switch-2-1.
- 42 tape robot backup system
- dedicated computer for backup
Rack 3
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch: switch-3-1.
- legacy nodes
Rack 4
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch: switch-4-1.
- legacy nodes
Rack 5
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch: switch-5-1.
- legacy nodes
Wet Lab
Donnelly 940. Planned June 2013.
- 4 instrument workstations
- 3 linux desktops HP Z430
- 1 windows7 desktop HP Z400
- 1 color printer
- 3 Mac lab laptops
- 1 switch: switch-w-1
Dry Lab
Donnelly 650. Planned June 2013.
- 6 linux desktops. HP Z430
- 1 windows7 desktop HP Z400
- 6 Mac lab laptops
- 1 switch: switch-d-1
Other Offices and locations
- BKS office
- JJI office
- desk space in OICR