== loose ends to deal with == | == loose ends to deal with == | ||
* switch-1-1, switch-2-1 | * switch-1-1, switch-2-1 | ||
* nfsdb, nfsbin, nfsproj, nfshome, | * nfsdb, nfsbin, nfsproj, nfshome, | ||
Line 55: | Line 54: | ||
== Strangelove == | == Strangelove == | ||
* cloud machine | |||
== Rocky == | |||
* cloud machine | * cloud machine | ||
Line 82: | Line 84: | ||
* Dell disk head node x 1, Dell SAS 2TB x 8??. | * Dell disk head node x 1, Dell SAS 2TB x 8??. | ||
* DL165 x 4. 8x4 = 32 cores. | * DL165 x 4. 8x4 = 32 cores. | ||
* Dell Switch | * Dell Switch: switch-1-1. | ||
* UPS | * UPS | ||
Line 89: | Line 91: | ||
* Dell PowerEdge C6145 | * Dell PowerEdge C6145 | ||
* Dell Switch | * Dell Switch: switch-2-1. | ||
* 42 tape robot backup system | * 42 tape robot backup system | ||
* dedicated computer for backup | * dedicated computer for backup | ||
Line 96: | Line 98: | ||
Currently in Pharmacy 8xx. Planned June 2013 | Currently in Pharmacy 8xx. Planned June 2013 | ||
* Dell PowerEdge C6145 | * Dell PowerEdge C6145 | ||
* Dell Switch | * Dell Switch: switch-3-1. | ||
* legacy nodes | * legacy nodes | ||
Line 102: | Line 104: | ||
Currently in Pharmacy 8xx. Planned June 2013 | Currently in Pharmacy 8xx. Planned June 2013 | ||
* will be: Dell PowerEdge 6145 | * will be: Dell PowerEdge 6145 | ||
* Dell Switch | * Dell Switch: switch-4-1. | ||
* legacy nodes | * legacy nodes | ||
Line 108: | Line 110: | ||
Currently in Pharmacy 8xx. Planned June 2013 | Currently in Pharmacy 8xx. Planned June 2013 | ||
* will be: Dell PowerEdge 6145 | * will be: Dell PowerEdge 6145 | ||
* Dell Switch | * Dell Switch: switch-5-1. | ||
* legacy nodes | * legacy nodes | ||
Line 120: | Line 122: | ||
* 1 color printer | * 1 color printer | ||
* 3 Mac lab laptops | * 3 Mac lab laptops | ||
* 1 switch: switch-w-1 | |||
== Dry Lab == | == Dry Lab == | ||
Line 126: | Line 129: | ||
* 1 windows7 desktop HP Z400 | * 1 windows7 desktop HP Z400 | ||
* 6 Mac lab laptops | * 6 Mac lab laptops | ||
* 1 switch: switch-d-1 | |||
== Other Offices and locations == | == Other Offices and locations == |
Revision as of 22:44, 6 April 2013
Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.
loose ends to deal with
- switch-1-1, switch-2-1
- nfsdb, nfsbin, nfsproj, nfshome,
- sundance
- vertigo
- spotless? old mysql
- oz = wilco ?
- contact
- lostark = postgreql
- airplane = mysql2
- brian = scratch.
- terminator = oracle
- psycho = license server
- strangelove = nfshead1
- pulp = nfshead2
Primary Logical Machines
These are machines you should log in to to do work.
sgehead
- log in here for routine access to the cluster
- epik / Schrodinger
- portland group compilers
ppilot
- pipeline pilot licenses
Secondary Logical Machines
You should not need to log in to these machines, generally, unless you are working on the functions they support.
contact
- static web server (e.g. lab web page, wordpress pages)
oz
- dynamic web server (e.g. ZINC, DUDE, DOCK Blaster)
Taxi
- ZINC database server
- cloud machine
Django
- cloud machine
Pulp
- cloud machine
Raiders
- cloud machine
Strangelove
- cloud machine
Rocky
- cloud machine
Infrastructure Machines
Fawlty & Towers
- disk servers
Blues
- function
Goldmember
- function
Darkness
- function
Spinaltap
- 389 server
Physical Machines
Rack 1
Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)
- 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
- HP disk head node, (25 TB raw disk systems ) x 4.
- Dell disk head node x 1, Dell SAS 2TB x 8??.
- DL165 x 4. 8x4 = 32 cores.
- Dell Switch: switch-1-1.
- UPS
Rack 2
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch: switch-2-1.
- 42 tape robot backup system
- dedicated computer for backup
Rack 3
Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch: switch-3-1.
- legacy nodes
Rack 4
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch: switch-4-1.
- legacy nodes
Rack 5
Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch: switch-5-1.
- legacy nodes
Wet Lab
Donnelly 940. Planned June 2013.
- 4 instrument workstations
- 3 linux desktops HP Z430
- 1 windows7 desktop HP Z400
- 1 color printer
- 3 Mac lab laptops
- 1 switch: switch-w-1
Dry Lab
Donnelly 650. Planned June 2013.
- 6 linux desktops. HP Z430
- 1 windows7 desktop HP Z400
- 6 Mac lab laptops
- 1 switch: switch-d-1
Other Offices and locations
- BKS office
- JJI office
- desk space in OICR