We also have a [[UCSF Cluster]] from our time in San Francisco. | We also have a [[UCSF Cluster]] from our time in San Francisco. | ||
Rack 1. Currently in Donnelly 630. | Rack 1. Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw) | ||
* 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) | * 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores. | ||
* HP disk head node, (25 TB raw disk systems ) x 4 | * HP disk head node, (25 TB raw disk systems ) x 4. | ||
* Dell disk head node x 1, Dell SAS 2TB x 8?? | * Dell disk head node x 1, Dell SAS 2TB x 8??. | ||
* DL165 x 4 | * DL165 x 4. 8x4 = 32 cores. | ||
* Dell Switch x 1 | * Dell Switch x 1 | ||
* UPS | * UPS |
Revision as of 20:29, 6 April 2013
Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.
Rack 1. Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)
- 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
- HP disk head node, (25 TB raw disk systems ) x 4.
- Dell disk head node x 1, Dell SAS 2TB x 8??.
- DL165 x 4. 8x4 = 32 cores.
- Dell Switch x 1
- UPS
Rack 2. Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch
- 42 tape robot backup system
- dedicated computer for backup
Rack 3. Currently in Pharmacy 8xx. Planned June 2013
- Dell PowerEdge C6145
- Dell Switch
- legacy nodes
Rack 4. Currently in Pharmacy 8xx. Planned June 2013
- will be: Dell PowerEdge 6145
- Dell Switch
- legacy nodes
Wet Lab. Donnelly 940. Planned June 2013.
- 4 instrument workstations
- 3 linux desktops HP Z430
- 1 windows7 desktop HP Z400
- 1 color printer
- 3 Mac lab laptops
Dry Lab. Donnelly 650. Planned June 2013.
- 6 linux desktops. HP Z430
- 1 windows7 desktop HP Z400
- 6 Mac lab laptops