Cluster 1: Difference between revisions

From DISI
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
We also have a [[UCSF Cluster]] from our time in San Francisco.  
We also have a [[UCSF Cluster]] from our time in San Francisco.  


Rack 1. Currently in Donnelly 630.
Rack 1. Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted.  (130 TB raw)


* 3x ( Dell PowerEdge C6145. =  2 x ( 256 GB / 64 cores / 6 TB raw disk ))
* 3x ( Dell PowerEdge C6145. =  2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
* HP disk head node, (25 TB raw disk systems ) x 4
* HP disk head node, (25 TB raw disk systems ) x 4
* Dell disk head node x 1, Dell SAS 2TB x 8??
* Dell disk head node x 1, Dell SAS 2TB x 8??.
* DL165 x 4
* DL165 x 4.  8x4 = 32 cores.
* Dell Switch x 1
* Dell Switch x 1
* UPS
* UPS

Revision as of 20:29, 6 April 2013

Our cluster at the University of Toronto St George Campus is described on this page. We also have a UCSF Cluster from our time in San Francisco.

Rack 1. Currently in Donnelly 630. Totals: 426 cores for cluster. 128 cores for infrastructure. 60 TB RAID-10 formatted. (130 TB raw)

  • 3x ( Dell PowerEdge C6145. = 2 x ( 256 GB / 64 cores / 6 TB raw disk )) 64 x 2 x 3 = 384 cores.
  • HP disk head node, (25 TB raw disk systems ) x 4.
  • Dell disk head node x 1, Dell SAS 2TB x 8??.
  • DL165 x 4. 8x4 = 32 cores.
  • Dell Switch x 1
  • UPS

Rack 2. Currently in Pharmacy 8xx. Planned June 2013

  • Dell PowerEdge C6145
  • Dell Switch
  • 42 tape robot backup system
  • dedicated computer for backup

Rack 3. Currently in Pharmacy 8xx. Planned June 2013

  • Dell PowerEdge C6145
  • Dell Switch
  • legacy nodes

Rack 4. Currently in Pharmacy 8xx. Planned June 2013

  • will be: Dell PowerEdge 6145
  • Dell Switch
  • legacy nodes

Wet Lab. Donnelly 940. Planned June 2013.

  • 4 instrument workstations
  • 3 linux desktops HP Z430
  • 1 windows7 desktop HP Z400
  • 1 color printer
  • 3 Mac lab laptops

Dry Lab. Donnelly 650. Planned June 2013.

  • 6 linux desktops. HP Z430
  • 1 windows7 desktop HP Z400
  • 6 Mac lab laptops

About our cluster